Friday, September 23, 2011

Mikado on the mainline

Here she is minus a proper train, but that will be the next order of business. I made some mistakes as a first time runner, but hopefully all will smooth out over time.




Thursday, September 15, 2011

It's ALIVE!!!!!!

Well, to borrow the cliche from Mary Shelly's Frankenstien "its alive".

I'll be posting some picutres of the rest of the building process, but here is a link to see it running on stationary rollers. I'll be taking it to Norm Saley's track next week to give it a proper shake down run. Albeit a short one though as I am still awaiting a piece that will allow me to use the axle pump I have added to the kit. The axle pump will allow water to be pumped into the boiler as it runs which will extend the run as long as I keep the tender filled with water. Aster hobbies has been good at working with me in providing the parts I need.

I needed the bottom sight glass soldered or replaced, but that part is on back order currently so Norm was kind to solder the one I have up the proper way so now it can build steam pressure. Well, I'll be taking a good lengthy video of it's first proper run on track, but until then, enjoy these short clips and if you are a veteran of live steam, feel free to let me know what you think. I can get it running at a pretty low speed, so I think I have the timing near where it should be in forward gear. Notching it back a bit slows it down as well while using less steam.


Wednesday, August 10, 2011

Boiler phase

Photobucket

So, time to do some plumbing work on the boiler to get all the fittings on. To help make it a bit easier to work on, I made a little boiler cradle out of some scrap wood.

Photobucket

Here I encountered a few leaks after doing a hydro test with my tender water pump hose connected to the clack valve (check valve) on the boiler back head. Using some more sealing compound I had all the ones I could fix addressed. However, there was one fitting which holds the sight glass to the bottom which I need to either have replaced or have someone solder as the solder never fully tinned the radius of the fitting. So, it leaks a lot there.

Photobucket

Photobucket

Photobucket



I also assembled the axle water pump and fit it on the chassis. This device will allow the boiler to be filled while under pressure with the rotation of the drivers. When the boiler is at the proper level I can open the bypass valve and return any water to the tender as the pump continues to do it's job.

Photobucket

Photobucket

It is here I encountered another issue. I am missing a part which will connect the axle water pump line to the clack valve. So, another roadblock and I have to await the part. No biggie. I don't have a deadline to get this engine running.

Here you can see the fire tubes which will superheat the steam as it passes with the steam line into the cylinders.
Photobucket

Now it was time to insulate the inside of the smoke box with some ceramic paper that Aster provides in the kit. This will seal up the smoke box from any outside air which might hinder the draft being created by the engine's blower and will also keep the outside of the smoke box a bit cooler to the touch, but caution will still have to be followed in handling an engine under steam.

Photobucket
Photobucket

Firebox insulated as well
Photobucket

Tuesday, July 26, 2011

Time.............

Well,
I got the rest of the valve gear on the chassis and spent quite a bit of time on "timing" the valve events. It involves setting the crank pin at the right angle, then having the other crank pin 90 degrees different. Then you have to adjust the slide valve via the block and set screws which bind down the block to the valve spindle. After reading over and over the directions and looking at the matching diagrams AND talking with a few people, I feel I have the valves timed for Forward motion pretty good. I put the nuts on the cylinder studs and now have to do an air test. Pushing the chassis along a length of track is great. Seeing all the working levers, arms and gear and feeling that compression from the cylinders is unlike any electric locomotive experience. I can see why those who have gone to live steam never look back at the electric train hobby.

Photobucket

Photobucket


Photobucket

Photobucket

Photobucket

Photobucket

Here are the parts for the dummy brakes
Photobucket

Saturday, July 23, 2011

What a wonderful Wife

I just wanted to take this moment to say thanks to my wonderful Wife, Erika. She is always happy to upload my pictures I have taken during my building. I then copy those and arrange them in my posts, but she really makes things easy for me on that end. I love her and she is also the reason why I am still building. She saw the passion I had this hobby to allow me to purchase it. I would not have done so without her support. It is a sacrifice for both of us. I know that it will bring me hours of joy not only because I will get to run it, but I will get to share it with my family and especially my children, Shannon and Forest. Thanks Erika.

Mounting the cylinders to the chassis

I wanted to get the cylinders mounted to the chassis for my last step before I take a break in building due to my work schedule and not having my set of needle files arrive yet. The next section will require a bit more filing for fit than previous sections. So, I got the front and rear motion plates on which will attach to the slide bars.

Photobucket

Then it was time to mount the first cylinder and get the steam and blast pipes lined up.

Photobucket

Next, I got the second cylinder on and then fastened everything up. While the blast pipe is snug between the two cylinder steam pipes, the valve chest steam pipes do not sit quite as snug against the center steam admission pipe (threaded one). There are 0 rings inside, but I won't know till I do an air test if it will hold or leak there due to it not being quite as snug.
I also have a bit of rubbing from the front screw/washer attaching the coupling rod to the first set of drivers on the engineers side (right side looking from cab to smokestack). It seems to rub a bit when the side play allows the axle box to slide on the axle as if the train were making a left handed turn. It does not bind up the drivers but I'll have to keep an eye on that as well when I do the air test. Other than that, it went together fine. Section 3 was rather mild compared to the previous section and not as fun, but still good to have everything on the chassis and it is definitely looking more and more like a real steam locomotive.

Photobucket

Photobucket

Friday, July 22, 2011

Cylinder success

I have just completed half of section 2 which is the cylinder and valve assembly. Following the directions and using some common sense the assembly went smooth as steam oil. I chose to use Steam cylinder oil to lubricate the gaskets for the valve chest and cylinder covers. The directions call for packing compound which is a silicone caulk, but one needs to be extra careful when using it as it can squeeze into places where it should not be and clog up the steam works quite literally. I know steam oil has been used by builders before and it is something which belongs in the cylinder block anyway. It was not as messy and easier to wipe up than the silicone caulk too.

Photobucket

I then proceeded to put the gasket rings on the piston and assemble the cross head and slide bars which will keep the piston motion straight in the cylinder bore. Here is where some common sense is needed when deciphering the directions. To be sure, the directions are fine, however sometimes things do not translate well, but thanks to the exploded drawings, things can be figured out with some careful thought. The directions call for the builder to not tighten down the screws which hold the slide bars to the rear cylinder cover. Later I learned that the only way to access the top screw was to tighten it before installing the steam chest. I think the idea was to keep the slide bars somewhat loose to allow for correction when making sure the piston slides smoothly without any hindrances.

Photobucket

Next was installing the steam branch pipes to both the cylinder block and steam chest or valve chest.

Photobucket

Then it was time to put those cylinder studs in the cylinder block. I had previously measured them and they needed to be 12mm in height when screwed into the cylinder block to allow for enough threads to hold the nut which sandwiches everything together after the valve timing is set at a later part of the build. I did add a bit of loctite 222 to the bottom of those threads to keep them from turning when I put on the nuts later.

Photobucket

Now it was time to set the valve and valve block into the steam chest. I added a bit of steam oil to coat the bottom. This will come in handy later when I do an air test. I had to install some set screws into the valve block which will bind down on the valve spindle. The block grips the valve spindle which is what moves the valve back and fourth over the ports, which in turn allow steam into the cylinder to move the piston.

Photobucket

Photobucket


The valve block has two holes for those set screws. It also has a hole running the length of the block which allows the valve spindle to slide in. The hole is at the bottom of the valve block and the holes for the set screw have a countersunk depression so it is clear which side is up. The diagram clearly shows the correct position of the valve and valve block, but it is hard to mess that up as the hole for the valve spindle which runs through the valve chest clearly shows which direction the valve and block need to face. I did have to lift the block up a bit to allow the spindle to enter it and this made the block rise up and slant down sort of like a ramp. I had talked with David Leech and he said this was normal. As the valve spindle is attached to the combination lever everything will line up as it should.

Here is where the I found the directions in section 2 to be a bit out of sequence. It calls for the assembly of the cylinder back plate and valve spindle guide to be added and then the valve spindle cross-head to be installed. Here is the problem with that order. The cylinder back plate has to go on the steam chest as it is being slid down the cylinder studs for it to clear the slide bar set screw which is holding it to the rear cylinder cover. The valve spindle cross head can not be attached to the valve spindle with the valve spindle guide already attached to the valve chest. So, I had to follow the diagram more than the written instructions, but in the end everything is as it should be. The piston moves smoothly as does the valve via the valve spindle.

Photobucket

Now, I need to assemble the other cylinder and then it will be on to section 3 which is putting the cylinders onto the chassis.

UPDATE I have completed the second cylinder. I'll try and get some pictures up later tonight. For those interested I was given an excellent website which has tons of info on steam locomotives, but in particular with the USRA Light Mikado. You can read about it here as well as get some photos of them.

Photobucket

Photobucket

Photobucket


Photobucket